PMP Sample Questions
- Activity duration estimate inputs include all of the following except:
- resource requirements.
- basis of estimates.
- activity lists.
- constraints.
Answer: B
- All of the following are contract types except:
- unit-price.
- make-or-buy.
- cost reimbursable.
- lump sum.
Answer: B
- Initiation inputs for a project include all of the following except:
- product description.
- strategic plan.
- project charter.
- selection criteria.
Answer: C
- Responses to risk threats include all of the following except:
- avoidance.
- acceptance.
- mitigation.
- rejection.
Answer: D
- The process of performance reporting includes all of the following except:
- status reporting.
- progress reporting.
- forecasting.
- product analysis.
Answer: D
- Constrained optimization methods of project selection include:
- scoring models.
- benefit-cost ratios.
- multi-objective programming algorithms.
- subjective analyses.
Answer: C
- Which of the following statements concerning contract type is correct?
- a fixed price contract contains the most risk for the buyer.
- cost reimbursable contracts offer sellers the highest profit potential.
- lump sum contracts offer sellers the greatest profit potential.
- unit price contracts are illegal in many jurisdictions.
Answer: C
- A Work Breakdown Structure (WBS) numbering system should allow project staff to:
- identify the level at which individual WBS elements are found.
- identify configuration management milestones.
- estimate the costs of WBS elements.
- provide project justification.
Answer: A
- All of the following are true quality statements except:
- Quality improvement depends upon better definit ion and increased awareness of
the requirements/specifications.
- Project quality management must address both management of the project and the
product of the project.
- Recognition of key actions required of each team member is necessary to meet
quality objectives.
- Computer-aided design systems can improve quality, but only at the expense of
an increase in the cost of design.
Answer: D
- All of the following are examples of tools often used in cost estimating except:
- parametric modeling.
- analogous estimating.
- bottom-up estimating.
- activity duration estimates.
Answer: D
« Previous || Next »
PMP Sample Question Number :
1-10|
11-20|
21-30|
31-40|
41-50|
51-60|
61-70|
71-80|
81-90|
91-100|
101-110|
111-120|
121-130|
131-140|
141-150|
151-160
|
|